Week 10

Materials

Class slides

Upcoming Capstone Deadlines

To do by Friday

Final Design and Implementation Plan

  • Upload it to Box in PDF format with your Capstone Project short name (e.g., GaiaFuture Design and Implementation Plan.pdf).
  • Email to your faculty advisor and client: be professional and thank them for their involvement.

Project Repository

  • Enter a link to your project repository on this Google sheet. This can be a link to your Capstone project GitHub organization or a specific repository.

Peer/Self Evaluation

  • Each student must complete a Capstone Project Peer & Self Evaluation Form for Winter Quarter.
  • Upload your evaluation form to Box and save your document with your Capstone Project short name and your full name as the file name (e.g., SaferSeafood Emily Case).
  • You must also email your evaluation directly to your faculty advisor.

Class surveys

  1. Addressing conflict workshop survey (5 minutes).

  2. UCSB course survey (10 minutes): https://ucsb.bluera.com/ucsb